PACIFIC STAR rs(3)

Pacific Star Tuna Repair

Pacific Star Tuna

Work carried out

  • Open Caesarean section for auxiliary engine change on starboard side, once the new auxiliary engine is introduced it is closed and welded.
  • Open C-section to insert bow thruster control panel. Once the panel is inserted, close and weld the C-section.
  • Manufacture, place and weld in its location the bow thruster electric panel in angle.
  • Scrapping of the current starboard auxiliary engine’s pollen which is removed.
  • Design, manufacture and place on board a dustbin for a new auxiliary engine.
  • Refurbishment of bow thruster steel to fit a new bow thruster.
  • Renovate sheet metal on starboard septic tank deck.